John Armitt, Chairman of the Olympic Delivery Authority, who is responsible for making sure the London 2012 Games venue is built on time, met with staff at Sunray on a visit to Kent.
Sunray Engineering is producing and installing high specification specialist steel doors for strategic London 2012 buildings.
You need to upgrade your Adobe Flash Player to version 9.0.28+